Cat6/6A and fibre, tested and labelled; extra-low-voltage runs kept clean of power; and electrical works, switchboards and UPS by licensed electricians — handed over with drawings that show what went where.
Builders, tenants and owners who need the physical layer done once, by one crew, before the systems go in — and logistics operators whose sorting equipment needs dedicated power and data.
Cat6/6A and fibre backbone and horizontal runs, patch panels and outlets, every run tested and the results kept.
Data, control and signalling cabling routed and separated from power so it performs as specified.
Circuits, switchboards and UPS for racks, sorting lines, kitchens and counters, by licensed electricians.
Dedicated supply and data for conveyors and sorters, installed to the equipment supplier's requirements.
Labelled drawings and a record of exactly what was installed, where, handed to you and kept on file for support.
We sequence with your builder and other trades so the cabling is in before the ceilings close and the comms room is ready for equipment.
What we confirm before quoting:
Routes, outlet positions and loads confirmed on site and on drawings.
Cabling and conduits installed with the build, before linings close.
Outlets, panels and switchboards fitted; every run tested and labelled.
As-built drawings and test results delivered; the site is ready for equipment.
On an existing site we test what is there, label what passes and re-run what does not, then give you the drawings the previous installer never did. Electrical defects found during the audit are reported with a quote rather than quietly worked around.
Tell us the site, what has to work and when. An engineer will come back to you within one business day.